🚨 Failed a fire inspection or have a leaking RPZ relief valve? Request Same-Day Valve Rebuild & Certification β†’
NFPA 25 & MUNICIPAL WATER COMPLIANCE

Fire Sprinkler Backflow Testing & Failed Valve Rebuilds

Certified testing, OS&Y supervisory valve coordination, and genuine OEM rebuilds for 2.5" to 10" fire line DCVA/RPZ assemblies and domestic backflow preventers across Toronto & the GTA.

πŸš’ Schedule Fire Line Test or Repair πŸ“ž Emergency Repair: (416) 578-3471
OWWA Certified Tester Cross Connection Control Specialist NIST Calibrated Gauges Toronto Water Authorized Peel Water Approved York Region Verified

Dual Compliance: Ontario Fire Code (NFPA 25) + Municipal Water By-laws

Commercial buildings, industrial warehouses, and high-rise condominiums rely on large-bore fire sprinkler and standpipe backflow preventers (typically 4", 6", 8", or 10" DCVA, DCDA, RPZ, or RPDA assemblies). Many fire alarm inspection companies flag these assemblies during annual inspections because they do not employ licensed Master Plumbers with active OWWA Cross-Connection Control certifications registered to file with municipal water portals.

We coordinate directly with your building superintendent and central fire monitoring station ("Test Mode" bypass) before operating tampered OS&Y or butterfly shut-off valvesβ€”preventing false fire department dispatches while completing both your municipal water filing and NFPA 25 inspection log sign-off.

Why RPZ & Fire Valves Fail

  • Relief Valve Dumping: Debris trapped under Check #1 or worn relief diaphragm
  • Check #1 / #2 Drop (< 1.0 PSI): Pitted elastomer disc or fatigued spring module
  • Seized OS&Y Gate Valves: Packing gland leaks or non-tight shutoff #2
  • Antifreeze Fire Loops: Glycol/chemical loops legally require an RPZ/RPDA assembly

OEM Valve Brands & Models We Rebuild On-Site

Manufacturer Common Commercial & Fire Models Sizes Serviced Typical Repair vs. Replace Solution
Watts 009, LF009, 909, 007, 709, 757, 757DCDA, 957RPDA 3/4" to 10" Full OEM rubber kit or modular torsion-spring check replacement + immediate re-test.
Zurn Wilkins 975XL, 975XL2, 375, 375AST, 350, 350AST, 475 3/4" to 10" Fast-swap AST cartridge module or seal ring kit replacement without cutting pipe.
Ames & Febco Ames 2000SS, 3000SS, 4000SS, Colt C200/C400; Febco 825Y, 850, 860, 880V 3/4" to 10" Cam-check assembly overhaul, relief sensor hose flush, and OS&Y stem packing repair.
Apollo / Conbraco & Hersey RPLF4A, DCLF4A, 40-100, 40-200 Series 3/4" to 8" Cartridge check rebuild or flange-to-flange grooved replacement if cast body is corroded.

Are You a Fire Protection or Sprinkler Inspection Company?

We partner with GTA fire alarm & sprinkler contractors as your dedicated OWWA-licensed sub-trade for annual backflow sign-offs, failed valve rebuilds, and large-bore fire line replacements.

πŸ“‹ Request Fire Line Testing or Sub-Trade Quote
πŸ›‘οΈ Direct Municipal Portal Filers

Request Fire Line Backflow Testing & Valve Rebuild

Submit your facility details or upload your municipal compliance notice below for fast scheduling and direct city portal filing.

  • βœ“ OWWA-Certified Cross-Connection Control Specialists
  • βœ“ NIST-Calibrated Differential Pressure Test Gauges
  • βœ“ Direct Electronic Filing (BSI Online, Toronto Water, Peel, York, Hamilton)
  • βœ“ Same-Day OEM Rubber Rebuilds (Watts, Zurn Wilkins, Febco, Ames)
Urgent 14-Day or 30-Day Shut-Off Notice? Call Dispatch 24/7: πŸ“ž (416) 578-3471
Or email your notice to [email protected]

By submitting, you agree to our Privacy Policy and Terms of Service.

πŸ“‹ Book Test πŸ“ž Call (416) 578-3471
WhatsApp (416) 578-3471