OWWA-certified facility plumbing surveys, CSA B64.10 hazard classification, premise isolation sign-off, and direct municipal portal submission across Toronto, Peel, York, Halton, Hamilton & Barrie.
A Cross-Connection Control Survey (Site Survey) is a room-by-room engineering and plumbing inspection of a commercial, industrial, institutional, or multi-residential building's internal water distribution network. Conducted by an OWWA-Certified Cross-Connection Control Specialist (CCCS), the audit identifies every point where municipal drinking water connects to chemical equipment, boilers, cooling towers, fire sprinklers, medical/dental chairs, commercial kitchens, or process lines.
Even if you test your existing backflow preventers every 12 months, Ontario municipalities legally require an updated Cross-Connection Survey every 5 years (or within 30–60 days of receiving a Notice of Cross-Connection Survey, or during a commercial tenant buildout/change of occupancy) to verify your building's CSA B64.10 Hazard Classification (Minor, Moderate, or Severe).
Flat-rate commercial site surveys including on-site water line walk-through, CSA B64.10 hazard classification, schematic documentation, and direct municipal submission.
✓ Ideal for Restaurants, Dental, Clinics & Bays
✓ Add Annual Device Testing for Only $175/unit
✓ Survey Fee Waived/Credited on New Installs
| Municipality | Governing By-law | Survey Cycle & Deadline | What Happens After the Survey? |
|---|---|---|---|
| City of Toronto | Municipal Code Ch. 851 | Every 5 years or within 30–60 days of City Notice | Premise isolation (RPZ or DCVA) verified or installed with Toronto Building plumbing permit. |
| Peel Region (Mississauga & Brampton) | Peel By-law 10-2017 | Every 5 years; 60 days from Notice of Survey | Filed by Peel Qualified Contractor; required backflow devices installed & tested within regional timeline. |
| York Region (Vaughan, Markham, Aurora) | Vaughan 177-2020 / Markham 2014-62 | Every 5 years + prior to occupancy alterations | Signed by Registered Qualified Person/Company and submitted directly to local municipal water authority. |
| Halton Region & Hamilton | Halton 63-13 / Hamilton 10-103 | Every 5 years via CCCP / Municipal Portal | Digital survey upload plus annual device test verification for all premise and zone assemblies. |
If your survey reveals that your building needs a new RPZ or DCVA backflow preventer installed, our licensed commercial plumbers credit a portion of your survey fee toward turnkey permit & installation.
📋 Upload Your Survey Notice & Book NowSubmit your facility details or upload your municipal compliance notice below for fast scheduling and direct city portal filing.