⚠️ Received a 30-Day or 60-Day Municipal Cross-Connection Survey Notice? Upload your notice & book your survey →
MANDATORY 5-YEAR MUNICIPAL AUDIT

5-Year Cross-Connection Control Site Surveys

OWWA-certified facility plumbing surveys, CSA B64.10 hazard classification, premise isolation sign-off, and direct municipal portal submission across Toronto, Peel, York, Halton, Hamilton & Barrie.

📋 Book Your Site Survey Now 📞 Call (416) 578-3471
OWWA Certified Cross-Connection Specialist Cross Connection Control Specialist CSA B64.10 Compliant Toronto Water Ch. 851 Authorized Peel Region Qualified Contractor York Region Approved Tester

What is a Mandatory Cross-Connection Control (CCC) Survey?

A Cross-Connection Control Survey (Site Survey) is a room-by-room engineering and plumbing inspection of a commercial, industrial, institutional, or multi-residential building's internal water distribution network. Conducted by an OWWA-Certified Cross-Connection Control Specialist (CCCS), the audit identifies every point where municipal drinking water connects to chemical equipment, boilers, cooling towers, fire sprinklers, medical/dental chairs, commercial kitchens, or process lines.

Even if you test your existing backflow preventers every 12 months, Ontario municipalities legally require an updated Cross-Connection Survey every 5 years (or within 30–60 days of receiving a Notice of Cross-Connection Survey, or during a commercial tenant buildout/change of occupancy) to verify your building's CSA B64.10 Hazard Classification (Minor, Moderate, or Severe).

Survey Requirements

  • Mandatory Cycle: Every 5 Years (or on tenant change)
  • Notice Window: 30 to 60 Days from City Letter
  • Authorized Signer: OWWA Certified CCCS / Master Plumber
  • Code Standard: CSA B64.10 & Ontario Building Code
  • Bundled Savings: Save $150 when combined with Annual Device Testing

Transparent Cross-Connection Site Survey Pricing

Flat-rate commercial site surveys including on-site water line walk-through, CSA B64.10 hazard classification, schematic documentation, and direct municipal submission.

SMALL COMMERCIAL / RETAIL

Single Unit (< 5,000 sq. ft.)

$495 flat rate

✓ Ideal for Restaurants, Dental, Clinics & Bays

  • ✓ Full On-Site Water Line & Equipment Audit
  • ✓ Premise Isolation Hazard Assessment
  • ✓ Official Municipal Survey Form Completion
  • ✓ Direct Electronic City Portal Filing
Book Small Facility Survey →
MOST POPULAR — ICI BUILDINGS

Mid-Size Facility (5k–25k sq. ft.)

$795 flat rate

✓ Add Annual Device Testing for Only $175/unit

  • ✓ Commercial Plazas, Warehouses & Mid-Rise
  • ✓ Boiler, HVAC, Fire Line & Process Line Audit
  • ✓ Zone, Area & Premise Isolation Inventory
  • ✓ Corrective Action Plan & City Submission
Book Mid-Size Survey →
HIGH-RISE CONDOS & PLANTS

25,000+ sq. ft. / Portfolios

Custom Bundle

✓ Survey Fee Waived/Credited on New Installs

  • ✓ High-Rise Condo Towers & Industrial Plants
  • ✓ Complete Valve Tagging & Asset Register
  • ✓ Multi-Building Property Manager Discounts
  • ✓ Turnkey RPZ/DCVA Installation Quotes
Request Custom Survey Quote →

Municipal Cross-Connection Survey Rules by Region

Municipality Governing By-law Survey Cycle & Deadline What Happens After the Survey?
City of Toronto Municipal Code Ch. 851 Every 5 years or within 30–60 days of City Notice Premise isolation (RPZ or DCVA) verified or installed with Toronto Building plumbing permit.
Peel Region (Mississauga & Brampton) Peel By-law 10-2017 Every 5 years; 60 days from Notice of Survey Filed by Peel Qualified Contractor; required backflow devices installed & tested within regional timeline.
York Region (Vaughan, Markham, Aurora) Vaughan 177-2020 / Markham 2014-62 Every 5 years + prior to occupancy alterations Signed by Registered Qualified Person/Company and submitted directly to local municipal water authority.
Halton Region & Hamilton Halton 63-13 / Hamilton 10-103 Every 5 years via CCCP / Municipal Portal Digital survey upload plus annual device test verification for all premise and zone assemblies.

Received a 60-Day Municipal Survey Order or Requiring Premise Isolation?

If your survey reveals that your building needs a new RPZ or DCVA backflow preventer installed, our licensed commercial plumbers credit a portion of your survey fee toward turnkey permit & installation.

📋 Upload Your Survey Notice & Book Now
🛡️ Direct Municipal Portal Filers

Request 5-Year Cross-Connection Site Survey

Submit your facility details or upload your municipal compliance notice below for fast scheduling and direct city portal filing.

  • ✓ OWWA-Certified Cross-Connection Control Specialists
  • ✓ NIST-Calibrated Differential Pressure Test Gauges
  • ✓ Direct Electronic Filing (BSI Online, Toronto Water, Peel, York, Hamilton)
  • ✓ Same-Day OEM Rubber Rebuilds (Watts, Zurn Wilkins, Febco, Ames)
Urgent 14-Day or 30-Day Shut-Off Notice? Call Dispatch 24/7: 📞 (416) 578-3471
Or email your notice to [email protected]

By submitting, you agree to our Privacy Policy and Terms of Service.

📋 Book Test 📞 Call (416) 578-3471
WhatsApp (416) 578-3471